There are usually several months between a windmill’s installation and commissioning. During that time, the inside of the foot can become moist, because there is no air circulation while the windmill is not operational.

ClientSeaway Heavy Lifting
IndustryIndustry
The question of Seaway Heavy Lifting

Because the foot of the wind turbine is moist, moulding occurs. This had to be cleaned, which was a very costly process. The feet of the wind turbines had to be cleaned before the turbines themselves could be commissioned. We were asked to provide a solution to this problem.

Our solution

By placing Container Desiccants in the foot, it is kept dry and free of mould. The desiccant eliminates the need to clean the foot, which is difficult to do at sea because it requires fresh water. Using the desiccant therefore saves a ton of time and money.

We always have for you
an appropriate solution

Would you like to know more about our products?
Looking for custom advice?
Please contact us without obligation.

Call +31 (0)85 888 1222
Mail info@ddc.nl

Contact us

© 2020 DDC.nl
DDC.nl is part of Canadaco B.V.
Website door Webton

Ask us your question

Send an email info@ddc.nl
Send an email via contact form
  • This field is for validation purposes and should be left unchanged.